The El Paso International Airport (EPIA) selected Huitt-Zollars to provide construction management and inspection services for the $17.5 million reconstruction of an existing 5,499-linear-foot runway and two taxiways, a new parallel taxiway, and three new connecting taxiways.
Huitt-Zollars provided the following services:
- Airport safety and security considerations
- Construction oversight of new signage
- Runway and taxiway edge lights
- Ten-foot stabilized shoulders alongside the proposed runway and reconstructed taxiways
- Storm water improvements
- Bridging over three liquid petroleum lines
- Relocation of El Paso water lines, FAA power and communication lines
- Storm water pollution prevention plan