Huitt-Zollars was Prime Design on this project aimed to remove a 40-year old 2,800-GPM lift station from service and replace it with a new 2,800-GPM lift station at a new location. The new design allows flow to be directed to two separate wastewater treatment plant locations through the use of two pairs of submersible pumps.
Let’s Build Something Great Together