Huitt-Zollars was Prime Design on this project aimed to remove a 40-year old 2,800-GPM lift station from service and replace it with a new 2,800-GPM lift station at a new location. The new design allows flow to be directed to two separate wastewater treatment plant locations through the use of two pairs of submersible pumps.