Huitt-Zollars provided design and construction administration services to convert a portion of San Antonio Avenue into a two-way street while improving the existing parkway. Street improvements consisted of HMAC overlay, curb and gutter, concrete intersection at El Paso Street and San Antonio Avenue, restriping lanes and on-street parking. Improvements also included redesigning existing traffic signals for two-way traffic. Parkway improvements consisted of replacing concrete sidewalks, installing colored stamped concrete, accessible ramps, landscaping, irrigation, trees and tree grates, benches, and parking meters.